Thermal Processing & Container Hygiene
Can Exhaust Tunnel
Applies heat during the exhaust stage before final closing. Equipment settings must be coordinated with the product, fill temperature and container process.

Thermal Processing & Container Hygiene
Applies heat during the exhaust stage before final closing. Equipment settings must be coordinated with the product, fill temperature and container process.

Applies heat during the exhaust stage before final closing. Equipment settings must be coordinated with the product, fill temperature and container process.
Provide your product, container dimensions, required output and current layout so the equipment can be matched to the line.
| Equipment | Can Exhaust Tunnel |
|---|---|
| Process category | Thermal Processing & Container Hygiene |
| Application | Integration before closing |
| Operating arrangement | Exhaust stage |
| Output, dimensions and utilities | Confirm for the selected model and application. |
This equipment is selected as part of the thermal processing & container hygiene section. Confirm product compatibility and the connection to upstream and downstream machines during the engineering review.
Explore production linesConveys inverted empty cans over steam nozzles before filling.
LET’S PLAN YOUR PROJECT
Share your product, capacity and packaging requirements.